How Many Kg Cement Required For 1000 Square Feet?

How Many Kg Cement Required For 1000 Square Feet
How many cement bags in 1000 sq ft? – 1000 square feet house cement calculator method has already been explained in the previous responses. So, I am just going to add a few points which I feel are really important for us to know. Making mortar from cement, aggregate, gravel, and water is crucial in the construction industry.

  • In masonry construction, the mortar serves as glue and bedding that ties together and fills the spaces between bricks, stones, or concrete.
  • Concrete, tiling, plaster, and brickwork all employ it.
  • A helpful hint for choosing the correct cement is that it must feel soft and sink instead of float when a small amount of it is placed in water.

For the most part, mixed cement (P.P.C. & P.S.C.) is chosen for masonry, tiling, and plastering, whilst O.P.C.53 grade is frequently employed for the production of concrete.0.40 kilogramme of cement is needed for every square foot. Therefore, the amount of cement required for a 1000 sq ft area is calculated by multiplying the built-up area by 0.40 kg.400 bags of cement make up the whole quantity of construction materials.

How many bags of cement required for 100 sq ft house?

How much cement required for 1000 sq ft house | how many bags of cement do i need for 1000 sq ft house construction | how much cement required for 400 sq ft, 500 sq ft, 600 sq ft, 800 sq ft, 900 sq ft, 1200 sq ft, 1400 sq ft, 1500 sq ft, 1600 sq ft, 1800 sq ft, 2000 sq ft, 2200 sq ft, 2400 sq ft, 2500 sq ft & 3000 sq ft house construction.

Cement is one of the important ingredient of concrete, generally it is mix in concrete due to adhesive and binding nature with fine and coarse aggregate. A small amount of lime is also added in concrete mix to increase the workability and strength of concrete. Cement is one of the important building material of RCC concrete, plain cement concrete.

It is mix with gravel and sand to prepare concrete for building homes, Bridge dams, when it is mixed with sand, prepare cement mortar which are generally used for brick laying and plastering of brick/ block wall. Enormous building material are used in home construction.

But certain materials are a part of every type of construction. A basic house construction requires cement, sand, aggregates mainly for making concrete, cement plaster and mortar. It requires bricks for masonry work, which may be replaced by concrete blocks too. Reinforcement in the RCC structure requires steel bars and ties.

Paint and tiles are also used in all the homes. Cement bags are required for preparing concrete for RCC and PCC structure, cement mortar between the bricks and for plastering the walls. Cement works well when blended with correct quantity of water, sand and aggregates.

As per thumb rule, on approximately 0.38 cement bag is used per sq ft of house construction. So, around 38 bags of cement (50kg each) are consumed for 100 sq ft house construction. ◆You Can Follow me on Facebook and Subscribe our Youtube Channel Quantity of cement required per sq ft :- for house construction, ground floor building, using thumb rule, you will need approximately 0.38 bags of Portland cement per sq ft of built – up area, so cement required per sq ft = built – up area × 0.38 in bags (50 kg of each).

You might be interested:  What Colour Goes With Brick Wallpaper?

Cement required for 100 sq ft house :- for 100 sq ft house construction, ground floor building, using thumb rule, you will need approximately 38 bags of cement (50 kg of each). As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.

Of bags of cement required = 100 ×0.38 = 38 bags, so that makes a total of 38 bags of 50 kg cement are required for 100 sq ft house. Cement required for 400 sq ft house :- for 400 sq ft house construction, ground floor building, using thumb rule, you will need approximately 152 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 400 ×0.38 = 152 bags, so that makes a total of 152 bags of 50 kg cement are required for 400 sq ft house. Cement required for 500 sq ft house :- for 500 sq ft house construction, ground floor building, using thumb rule, you will need approximately 190 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 500 ×0.38 = 190 bags, so that makes a total of 190 bags of 50 kg cement are required for 500 sq ft house. Cement required for 600 sq ft house :- for 600 sq ft house construction, ground floor building, using thumb rule, you will need approximately 230 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 600 ×0.38 = 230 bags, so that makes a total of 230 bags of 50 kg cement are required for 600 sq ft house. Cement required for 800 sq ft house :- for 800 sq ft house construction, ground floor building, using thumb rule, you will need approximately 305 bags of cement (50 kg of each).

  • As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
  • Of bags of cement required = 800 ×0.38 = 305 bags, so that makes a total of 305 bags of 50 kg cement are required for 800 sq ft house.
  • Cement required for 900 sq ft house :- for 900 sq ft house construction, ground floor building, using thumb rule, you will need approximately 345 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 900 ×0.38 = 345 bags, so that makes a total of 345 bags of 50 kg cement are required for 900 sq ft house. Cement required for 1000 sq ft house :- for 1000 sq ft house construction, ground floor building, using thumb rule, you will need approximately 380 bags of cement (50 kg of each).

  • As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
  • Of bags of cement required = 1000 ×0.38 = 380 bags, so that makes a total of 380 bags of 50 kg cement are required for 1000 sq ft house.
  • Cement required for 1200 sq ft house :- for 1200 sq ft house construction, ground floor building, using thumb rule, you will need approximately 460 bags of cement (50 kg of each).
You might be interested:  What Is General Requirements In Construction?

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 1200 ×0.38 = 460 bags, so that makes a total of 460 bags of 50 kg cement are required for 1200 sq ft house. Cement required for 1400 sq ft house :- for 1400 sq ft house construction, ground floor building, using thumb rule, you will need approximately 535 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 1400 ×0.38 = 535 bags, so that makes a total of 535 bags of 50 kg cement are required for 1400 sq ft house. Cement required for 1500 sq ft house :- for 1500 sq ft house construction, ground floor building, using thumb rule, you will need approximately 570 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 1500 ×0.38 = 570 bags, so that makes a total of 570 bags of 50 kg cement are required for 1500 sq ft house. Cement required for 1600 sq ft house :- for 1600 sq ft house construction, ground floor building, using thumb rule, you will need approximately 610 bags of cement (50 kg of each).

  • As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
  • Of bags of cement required = 1600 ×0.38 = 610 bags, so that makes a total of 610 bags of 50 kg cement are required for 1600 sq ft house.
  • Cement required for 1800 sq ft house :- for 1800 sq ft house construction, ground floor building, using thumb rule, you will need approximately 685 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 1800 ×0.38 = 685 bags, so that makes a total of 685 bags of 50 kg cement are required for 1800 sq ft house. Cement required for 2000 sq ft house :- for 2000 sq ft house construction, ground floor building, using thumb rule, you will need approximately 760 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 2000 ×0.38 = 760 bags, so that makes a total of 760 bags of 50 kg cement are required for 2000 sq ft house. Cement required for 2200 sq ft house :- for 2200 sq ft house construction, ground floor building, using thumb rule, you will need approximately 840 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 2200 ×0.38 = 840 bags, so that makes a total of 840 bags of 50 kg cement are required for 2200 sq ft house. Cement required for 2400 sq ft house :- for 2400 sq ft house construction, ground floor building, using thumb rule, you will need approximately 915 bags of cement (50 kg of each).

You might be interested:  Which Of The Following Triangle Is Possible With Rhs Construction?

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 2400 ×0.38 = 915 bags, so that makes a total of 915 bags of 50 kg cement are required for 2400 sq ft house. Cement required for 2500 sq ft house :- for 2500 sq ft house construction, ground floor building, using thumb rule, you will need approximately 950 bags of cement (50 kg of each).

As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 2500 ×0.38 = 950 bags, so that makes a total of 950 bags of 50 kg cement are required for 2500 sq ft house. Cement required for 3000 sq ft house :- for 3000 sq ft house construction, ground floor building, using thumb rule, you will need approximately 1150 bags of cement (50 kg of each).

How to calculate the quantity of cement required for a flat slab?

Cement, Sand, & Aggregates For 1000 sq ft Slab: – To calculate the quantity of cement, sand, and aggregates required for a flat slab first we need to calculate the volume. Area of flat slab = 1000 sq.ft =93 sq.m. The minimum thickness provided for the slab is 150 mm.( According to IS 456) 150 mm = 0.15 metres Hence Wet volume = Area of slab x Thickness of slab Wet volume = 93 x 0.15 = 13.95 cu.m.

How much concrete is required to build a 600 sq ft roof?

Assuming the depth of concrete of such 600 sq,ft RCC Roof top as 4″, the volume of the concrete will be 200 cu.ft. Assuming that you will be laying such concrete on volume basis by adopting a ratio of 1:2:4, you require 36 bags of cement of 50 kg each

How many cement bags required for RCC concrete structure footing?

Cement bags required for brickwork of 1000 square feet house – 1) cement consumption in external brick wall External brick wall length = 2(40+25) = 130 ft Height of brick wall = 10 feet Height of brick wall above roof slab = 3 feet Depth of brick wall below plinth = 2 feet Total height = 15 feet Area of external brick wall = 130×15 = 1950 sqft Volume = 1950 sq ft × 9 inch = 1462.5 cu ft Volume = 1462.5/35.3147 = 41.413 m3 Volume of brickwork = 41.413 m3 thumb rule for cement bags in external wall brickwork is 1.26 cement bags/m3 of brickwork of 9 inch ( cement sand ratio 1:6) no of cement bags = 41.413 × 1.26 = 52 bags 2) cement consumption in internal brick wall brick wall length = 40+25+25 = 90 ft Height of brick wall = 10 feet Depth of brick wall below plinth = 2 feet Total height = 12 feet Area of external brick wall = 90×12 = 1080 sqft Volume = 1080 sq ft × 4.5 inch = 405 cu ft Volume = 405/35.3147 = 11.468 m3 Volume of brickwork = 11.468 m3 thumb rule for cement bags in internal wall brickwork is 1.28 cement bags/m3 of brickwork of 4.5 inch ( cement sand ratio 1:4) no of cement bags = 11.468 × 1.28 = 15 bags Total no of cement bags = 52 + 15 = 67 67 no of cement bags required for brickwork of 1000 square feet house