How much cement required for 1000 sq ft house | how many bags of cement do i need for 1000 sq ft house construction | how much cement required for 400 sq ft, 500 sq ft, 600 sq ft, 800 sq ft, 900 sq ft, 1200 sq ft, 1400 sq ft, 1500 sq ft, 1600 sq ft, 1800 sq ft, 2000 sq ft, 2200 sq ft, 2400 sq ft, 2500 sq ft & 3000 sq ft house construction.
- Cement is one of the important ingredient of concrete, generally it is mix in concrete due to adhesive and binding nature with fine and coarse aggregate.
- A small amount of lime is also added in concrete mix to increase the workability and strength of concrete.
- Cement is one of the important building material of RCC concrete, plain cement concrete.
It is mix with gravel and sand to prepare concrete for building homes, Bridge dams, when it is mixed with sand, prepare cement mortar which are generally used for brick laying and plastering of brick/ block wall. Enormous building material are used in home construction.
- But certain materials are a part of every type of construction.
- A basic house construction requires cement, sand, aggregates mainly for making concrete, cement plaster and mortar.
- It requires bricks for masonry work, which may be replaced by concrete blocks too.
- Reinforcement in the RCC structure requires steel bars and ties.
Paint and tiles are also used in all the homes. Cement bags are required for preparing concrete for RCC and PCC structure, cement mortar between the bricks and for plastering the walls. Cement works well when blended with correct quantity of water, sand and aggregates.
As per thumb rule, on approximately 0.38 cement bag is used per sq ft of house construction. So, around 38 bags of cement (50kg each) are consumed for 100 sq ft house construction. ◆You Can Follow me on Facebook and Subscribe our Youtube Channel Quantity of cement required per sq ft :- for house construction, ground floor building, using thumb rule, you will need approximately 0.38 bags of Portland cement per sq ft of built – up area, so cement required per sq ft = built – up area × 0.38 in bags (50 kg of each).
Cement required for 100 sq ft house :- for 100 sq ft house construction, ground floor building, using thumb rule, you will need approximately 38 bags of cement (50 kg of each). As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
Of bags of cement required = 100 ×0.38 = 38 bags, so that makes a total of 38 bags of 50 kg cement are required for 100 sq ft house. Cement required for 400 sq ft house :- for 400 sq ft house construction, ground floor building, using thumb rule, you will need approximately 152 bags of cement (50 kg of each).
As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 400 ×0.38 = 152 bags, so that makes a total of 152 bags of 50 kg cement are required for 400 sq ft house. Cement required for 500 sq ft house :- for 500 sq ft house construction, ground floor building, using thumb rule, you will need approximately 190 bags of cement (50 kg of each).
- As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
- Of bags of cement required = 500 ×0.38 = 190 bags, so that makes a total of 190 bags of 50 kg cement are required for 500 sq ft house.
- Cement required for 600 sq ft house :- for 600 sq ft house construction, ground floor building, using thumb rule, you will need approximately 230 bags of cement (50 kg of each).
As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 600 ×0.38 = 230 bags, so that makes a total of 230 bags of 50 kg cement are required for 600 sq ft house. Cement required for 800 sq ft house :- for 800 sq ft house construction, ground floor building, using thumb rule, you will need approximately 305 bags of cement (50 kg of each).
As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 800 ×0.38 = 305 bags, so that makes a total of 305 bags of 50 kg cement are required for 800 sq ft house. Cement required for 900 sq ft house :- for 900 sq ft house construction, ground floor building, using thumb rule, you will need approximately 345 bags of cement (50 kg of each).
Contents
- 0.1 For 2000 sq.ft How many Cement Bags will be Required for House Construction?
- 0.2 How many cement bags are required for a residential building?
- 0.3 What is the thumb rule for cement quantity calculation for 1500 square feet?
- 0.4 How many bags of cement for 1 cubic meter concrete?
- 1 What is the thumb rule for cement bags for plaster?
For 2000 sq.ft How many Cement Bags will be Required for House Construction?
As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 900 ×0.38 = 345 bags, so that makes a total of 345 bags of 50 kg cement are required for 900 sq ft house. Cement required for 1000 sq ft house :- for 1000 sq ft house construction, ground floor building, using thumb rule, you will need approximately 380 bags of cement (50 kg of each).
- As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
- Of bags of cement required = 1000 ×0.38 = 380 bags, so that makes a total of 380 bags of 50 kg cement are required for 1000 sq ft house.
- Cement required for 1200 sq ft house :- for 1200 sq ft house construction, ground floor building, using thumb rule, you will need approximately 460 bags of cement (50 kg of each).
As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 1200 ×0.38 = 460 bags, so that makes a total of 460 bags of 50 kg cement are required for 1200 sq ft house. Cement required for 1400 sq ft house :- for 1400 sq ft house construction, ground floor building, using thumb rule, you will need approximately 535 bags of cement (50 kg of each).
- As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
- Of bags of cement required = 1400 ×0.38 = 535 bags, so that makes a total of 535 bags of 50 kg cement are required for 1400 sq ft house.
- Cement required for 1500 sq ft house :- for 1500 sq ft house construction, ground floor building, using thumb rule, you will need approximately 570 bags of cement (50 kg of each).
As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 1500 ×0.38 = 570 bags, so that makes a total of 570 bags of 50 kg cement are required for 1500 sq ft house. Cement required for 1600 sq ft house :- for 1600 sq ft house construction, ground floor building, using thumb rule, you will need approximately 610 bags of cement (50 kg of each).
- As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
- Of bags of cement required = 1600 ×0.38 = 610 bags, so that makes a total of 610 bags of 50 kg cement are required for 1600 sq ft house.
- Cement required for 1800 sq ft house :- for 1800 sq ft house construction, ground floor building, using thumb rule, you will need approximately 685 bags of cement (50 kg of each).
As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 1800 ×0.38 = 685 bags, so that makes a total of 685 bags of 50 kg cement are required for 1800 sq ft house. Cement required for 2000 sq ft house :- for 2000 sq ft house construction, ground floor building, using thumb rule, you will need approximately 760 bags of cement (50 kg of each).
- As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
- Of bags of cement required = 2000 ×0.38 = 760 bags, so that makes a total of 760 bags of 50 kg cement are required for 2000 sq ft house.
- Cement required for 2200 sq ft house :- for 2200 sq ft house construction, ground floor building, using thumb rule, you will need approximately 840 bags of cement (50 kg of each).
As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 2200 ×0.38 = 840 bags, so that makes a total of 840 bags of 50 kg cement are required for 2200 sq ft house. Cement required for 2400 sq ft house :- for 2400 sq ft house construction, ground floor building, using thumb rule, you will need approximately 915 bags of cement (50 kg of each).
- As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No.
- Of bags of cement required = 2400 ×0.38 = 915 bags, so that makes a total of 915 bags of 50 kg cement are required for 2400 sq ft house.
- Cement required for 2500 sq ft house :- for 2500 sq ft house construction, ground floor building, using thumb rule, you will need approximately 950 bags of cement (50 kg of each).
As 0.38 bags of 50kg cement is used per sq ft of built- up area of house, No. of bags of cement required = 2500 ×0.38 = 950 bags, so that makes a total of 950 bags of 50 kg cement are required for 2500 sq ft house. Cement required for 3000 sq ft house :- for 3000 sq ft house construction, ground floor building, using thumb rule, you will need approximately 1150 bags of cement (50 kg of each).
So, now we know that 135 bags of cement are needed for the ground flooring of concrete for houses measuring 1500 square feet.
How many cement bags are required for a residential building?
How many cement bags required for plastering of 1500 square feet house – 1) external plastering of brick wall Length total = 160 ft Height = 10 ft Area of plastering = 160 × 10 = 1600 sq ft thumb rule for cement bags for external plastering is 0.017017 cement bags/ sq ft plastering no of cement bags = 1600 × 0.017017 = 27 bags 2) internal plastering of brick wall Length total = 340 ft Height = 10 ft Area of plastering = 340 × 10 = 3400 sq ft thumb rule for cement bags for external plastering is 0.0086 cement bags/ sq ft plastering no of cement bags = 3400 × 0.0086 = 29 bags 3) ceiling plastering of roof slab Length total = 1000 ft thumb rule for cement bags for ceiling plastering is 0.0051 cement bags/ ft plastering no of cement bags = 1500 × 0.0051 = 7.5 bags Total no of cement bags = 27 + 29 + 7.5 = 64 ● Ans.
:- 64 no of cement bags required for external wall plastering,internal wall plastering and ceiling plastering of 1500 square feet house Now total number of cement bags required for 1500 square feet house 1) rcc concrete = 412.5 bags 2) Brickwork = 87 bags 3) flooring + septic tank + stair = 134.5 bags 4) plastering = 64 bags Total no of cement bags = 698 ● Ans.
:- 698 (+ 5% and _ 5℅ shift) no of cement bags ( 412.5 cement bags for rcc concrete, 87 cement bags for brickwork, 134.5 cement bags for flooring, septic tank including stair & 64 cement bags for plastering) are required for construction of 1500 square feet house of low rise ground floor building. How many cement bags required for 1500 square feet house ?
What is the thumb rule for cement quantity calculation for 1500 square feet?
How many cement bags required for 1500 sq ft house – For general residential low rise building of ground floor house we have to calculate cement bags. We use different types of Thumb Rule for cement quantity calculation in all type of RCC structure footing, column, beam & RCC slab,brickwork, flooring & plastering.
How many bags of cement for 1 cubic meter concrete?
By the way for the concrete mix 1:3:6 you will need 4.44 (approx) bags of cement but you have to buy 5 bags of cement for 1 cubic meter of concrete for 1:3:6 mix ratio. Now, for 1:3:6 mix the proportion of cement is 1/10.
What is the thumb rule for cement bags for plaster?
How many cement bags required for plastering of 1500 square feet house – 1) external plastering of brick wall Length total = 160 ft Height = 10 ft Area of plastering = 160 × 10 = 1600 sq ft thumb rule for cement bags for external plastering is 0.017017 cement bags/ sq ft plastering no of cement bags = 1600 × 0.017017 = 27 bags 2) internal plastering of brick wall Length total = 340 ft Height = 10 ft Area of plastering = 340 × 10 = 3400 sq ft thumb rule for cement bags for external plastering is 0.0086 cement bags/ sq ft plastering no of cement bags = 3400 × 0.0086 = 29 bags 3) ceiling plastering of roof slab Length total = 1000 ft thumb rule for cement bags for ceiling plastering is 0.0051 cement bags/ ft plastering no of cement bags = 1500 × 0.0051 = 7.5 bags Total no of cement bags = 27 + 29 + 7.5 = 64 ● Ans.
64 no of cement bags required for external wall plastering,internal wall plastering and ceiling plastering of 1500 square feet house Now total number of cement bags required for 1500 square feet house 1) rcc concrete = 412.5 bags 2) Brickwork = 87 bags 3) flooring + septic tank + stair = 134.5 bags 4) plastering = 64 bags Total no of cement bags = 698 ● Ans.
:- 698 (+ 5% and _ 5℅ shift) no of cement bags ( 412.5 cement bags for rcc concrete, 87 cement bags for brickwork, 134.5 cement bags for flooring, septic tank including stair & 64 cement bags for plastering) are required for construction of 1500 square feet house of low rise ground floor building. How many cement bags required for 1500 square feet house ?