What Is Epc Mode In Construction?

What Is Epc Mode In Construction
Single Point of Responsibility – One of the main distinctive features of an EPC Contract is that the EPC Contractor is solely responsible for the Project. An EPC Contractor would undertake works such as designing, engineering, procurement, construction, commissioning and testing works.

  • Hence, in the event there is an issue arising out of or in connection with the Project, the Employer will only need to refer the said issue to the EPC Contractor.The EPC Contractor would then be liable for any defects and rectifications of the same or to provide compensation to the Employer.
  • In cases where the EPC Contractor is a consortium comprising several entities, the EPC Contractor will typically state in the EPC Contract that such entities are jointly and severally liable to the Employer.

The EPC Contractor will also be responsible for the works carried out by any appointed Subcontractor (as defined below) and for any acts or omissions of the Subcontractor.

What does EPC stand for in construction?

What does “EPC” mean? – In the construction industry, EPC is an acronym that stands for Engineering Procurement Construction. EPC is a type of project delivery model (or contract agreement) where contractors are responsible for the project from start to finish. What Is Epc Mode In Construction Here is what is typically included in each stage of the Engineering Procurement Construction model:

What are EPC models?

Overview – EPC models are a variation of the design and construct model, but are more complex and detailed. The principal engages a contractor to design, build and deliver the asset in an operational state. The principal provides a general scope to the contractor which is focussed on the functionality and performance requirements of the asset upon completion,

That enables the principal to step in, at completion, and ‘turn a key’ to operate the asset. EPC contracts provide the most suitable framework for projects where significant engineering expertise is required, the design is determined by functionality (rather than aesthetics), there is greater focus on performance requirements and the principal does not need to control the design.

This method is generally used for large scale energy and resources developments such as power stations, process plants, other major plants, oil and gas projects, and the delivery of mining infrastructure.

What is the role of an EPC?

A critical infrastructure project is a large investment in capital, resources and time. For that reason, many organizations choose to engage an Engineering, Procurement and Construction (EPC) contractor when taking on a large project. Some firms may not employ the appropriate personnel, like engineers or trade craftsmen, to dedicate to the project.

Others may employ these specialty workers, but their time is already fully engaged in the business. An EPC contractor, like Matrix Service Company, can provide turnkey solutions for your project. They will partner with you throughout all of the project stages, ensuring your goals are met and you are satisfied with the result.

EPC contractors leverage their resources, experience and industry knowledge to better your project. You are still in control, making critical decisions and guiding specifications, but your involvement does not sacrifice your business operations. Instead of hiring dozens of contractors each with their own bids and contracts, you have a single relationship and a single point of responsibility to manage.

Next, we’ll take a look at the role of an EPC contractor throughout the phases of your project. Concept Development As you begin to frame your project, determining the priorities and objectives for your facility, an EPC contractor can begin working on the conceptual design. The contractor will design a facility or retrofit based on the capacity, inputs, outputs, throughput and other specifications you need.

Feasibility Studies Once one or more concepts have been identified, an EPC contractor can conduct feasibility studies to help evaluate your options. In this stage, the budget and design are both refined. With better estimates and narrower scope, you can determine which concept is best for your application.

Front-End Engineering and Design (FEED) With your preferred concept, an EPC contractor can move forward with FEED. Detailed design, engineering and procurement can begin. Process and Instrument Diagrams (P&IDs), Process Flow Diagrams, Process Hazard Analysis (PHA) are just a few of the documents that will be created for you during this process.

The documentation created during FEED will assist during the construction phase but will also be important as you move into operations. FEED will also produce a project cost estimate that is suitable for project financing decisions. Engineering, Procurement & Construction With your approval, construction can begin.

  1. Your contractor will manage labor, equipment and raw materials.
  2. All of the pre-project planning will guide construction.
  3. Project managers will proactively troubleshoot any issues on the job site and see that your facility is completed with quality craftsmanship.
  4. The EPC contractor will also be responsible for managing the project timeline and budget for the contracted scope.

Commissioning & Operations Commissioning is a labor-intensive process and an EPC contractor can help you get your facility up and running if you choose. Once everything is running smoothly, it’s time to turn over operations to you. A Higher Standard for Your Project Working with an EPC contractor can be a smart investment in your business.

When you partner with someone like Matrix Service Company, you bring 35+ years of experience and industry expertise to your project. When you choose Matrix for your next EPC contract, you can be confident your project will be on time and on budget. We have the resources, strategic locations, and engineering capabilities to see that your project raises the bar for facilities in your industry.

Move to a higher standard. Call to get started today.

You might be interested:  What Is The Third Principle Of Paragraph Construction?

What is EPC example?

Bibliography –

Hartman, Francis T. (2003). The Ten Commandments of Better Contracting: A Practical Guide to Adding Value to an Enterprise Through More Effective Smart Contracting, ASCE Publications. pp.69–71.,

Retrieved from “” : Engineering, procurement, and construction – Wikipedia

What is an EPC project manager?

EPC is an abbreviation for Engineering, procurement and construction. It deals with the procedure and process related to managing projects from the inception stage to the completion stage. This is more of a legal contractual arrangement where an individual or a company known as an EPC contractor would streamline the process related to a particular project or construction from its inception phase to the completion phase.

  1. The EPC contractor would be responsible for carrying out all the activities from the initial design, production, processing and completion of the project.
  2. Once the project is completed, it would be handed over to the end user.
  3. The end user or owner would take the project only when it is completed.
  4. EPC project management hence would be considered as the entire process which is dealt by the EPC contractor.

Engineering the contract, would consider all the requirements of the contract. This would include the time taken to consider the form of contract, materials required, individuals responsible for carrying out the activities and the sanction plan or blue print of the construction.

  1. Procurement would include the purview of securing all the capital goods and raw materials required for carrying out the project.
  2. Under procurement, the contracts which are entered into for securing raw materials would also be carried out.
  3. Construction would include the implementation phase of the entire project.

Here the main criteria would be the resources utilised in carrying out the construction. Apart from this, the time aspect would be the main criterion for this. Hence EPC project management would be the entire process of managing the project from the inception phase to the completion phase.

How does an EPC model work?

What are Engineering, Procurement and Construction (EPC) Contracts? – Many companies in the renewable energy industry and power sector commonly use E ngineering, Procurement and Construction (EPC) contracts (or turnkey construction contracts) for complex infrastructure projects.

This form of contract sets out the relationship between the owner and the contractor for the provision of professional or technical services. Under an EPC contract, the principal or owner enters into a contract with the EPC contractor, who will, in turn, enter into various subcontracts with subcontractors for the performance of specified portions of work.

They will be responsible for not only the engineering aspects of the project, but also procurement of equipment and design and construction of the facility, plant or project. For owners of projects, EPC contracts allow them to manage risk more effectively and also allow contractors to allocate and specialise in the work they undertake.

This model is used where the owner’s concept design is based more on functionality and they need someone to engineer a solution to produce that functionality. Under common EPC agreements, contractors have full control of the design, procurement and construction of the project from inception to completion.

Many people refer to EPC contracts as turnkey construction contracts as it allows the owner to simply ‘turn the key’ when the project is complete for the system to be fully operational. In addition to delivering a complete facility or plant, contractors must also deliver it for a guaranteed price and date.

This guarantee means that the contractor, and not the principal, will incur any additional costs. If the plant is not complete to the specified level upon completion, the contractor may also incur financial liability. It is important to note that EPC contracts differ to EPCM contracts. EPCM stands for Engineering, Procurement and Construction Management.

Here, an EPCM contractor takes an administrative and management role in the engineering and design aspect of the project. They manage the project as the owner’s agent and oversees the project.

What is EPC process engineer?

Responsible for the execution of process design involving preparation of calculations and review of process design drawings in accordance to customer specifications, applicable codes, standards and other generally accepted practices in the design of industrial plants such as petrochemical and oil refineries.

Who prepares an EPC?

Energy Performance Certificates (EPCs) can only be produced by energy assessors who are members of a government-approved accredited scheme for that type of building, and who have the appropriate qualifications or experience. Energy assessors:

may be employed by a company – such as an estate agency or energy company – or be independent traders must produce an EPC using the correct government-approved software for the type of building have a duty of care and hold responsibility for the EPC throughout the ten years it is valid can appoint an individual or a team to help them gather information as long as the team members work under their direction are expected to visit business properties in person to make sure the information others have gathered is accurate

Energy assessors are also responsible for:

ensuring that their assistants have the technical ability to carry out the work, are ‘fit and proper’ and have the proper insurance in place all actions, data and output of EPCs and recommendation reports as if they themselves had collected the data acting in an independent manner conducting energy assessments, producing EPCs and lodging them with their accreditation scheme

There are three levels of business building types and the energy assessor must be trained, qualified and accredited for the particular type of building and the associated government-approved software:

level three covers simple, existing properties including small buildings or houses that have been converted to business use, eg doctors’ surgeries, and uses software based on the Simplified Building Energy Model (SBEM) level four covers other new and existing properties, eg purpose-built office blocks, and uses software based on SBEM level five covers new and existing properties incorporating complex or innovative energy efficiency feature for which SBEM is not suitable, eg large office buildings and complex factories, and uses Dynamic Simulation Model tools

Who performs an EPC?

EPCs must be carried out by an accredited domestic energy assessor which you can source in your area at the government’s official EPC register. However, if you are using an estate agent to sell your home or letting agent to rent it, it should be part of their job to ensure there is a valid EPC on the property.

You might be interested:  How Long Does A Brick Wall Take To Dry Out?

Who is responsible for EPC?

Do buildings which have been extended or modified require an EPC? – Where construction work is undertaken to a building and the modifications

change the number of parts designed or altered for separate use and include the provision or extension of any fixed services for heating, hot water, air-conditioning and mechanical ventilation

An EPC must be given to the owner of the building by the person responsible for having the construction work carried out (ie the builder). A copy of the EPC must be given to Building Control not more than five days after the work has been completed.

How do you calculate EPC?

An accredited energy assessor will conduct a visual inspection of your property for an EPC for domestic properties, They will take a measured survey, photographs, and calculate the EPC rating by recording lights, windows, heating, and radiators. To carry out the assessment properly, the assessor will access every part of the property and check things like how much insulation there is, the size and construction type of the property, the heating and lighting systems, and ventilation.

What is EPC in quality control?

Meaning of EPC Project: – EPC (Engineering, Procurement, and Construction) is a contract-based project delivery model. It is a standard term that refers to a special form of project execution and contract design.3- In turnkey, contractor is responsible to perform from start-up engineering to construction, commissioning till takeover of the plant to employer What is EPCM? EPCM stands for Engineering, Procurement and Construction Management. Here contractor takes an administrative and management role in the engineering and design aspect of the project. They manage the project as the owner’s agent and oversees the project. EPC coordination: – An EPC has to coordinate various department & segments Quality Evaluation Basis of EPC: – Basis of quality assurance & evaluation depends of mainly 3 factors · Technology & infrastructure employed · Quality management of deliverables · Quality management of handling process Now for EPC type job Technology & infrastructure employed depend upon EPC contractor & feasibility of the same on process.

Deliverables means product, activity & services whose quality assured & control individual product, system & standard practice wise. Quality management handling of departmental process assured by quality management system & controlled by their KPI. EPC Project Oriented KPI’s: – Here are the involved relevant departmentwide KPI For Project Group Head:- · Revenue growth.

· Revenue per client. · Profit margin. · Client retention rate. · Customer satisfaction. · Positive Cash Flow maintained in project · Internal process quality · Employee satisfaction · Monthly monitor of health of business / expansion rate, Lead to win conversion Marketing Sales · Cost per Conversion · Marketing Expenses and Traffic · Conversion Funnel · ROI · Revenue and Wins by Type · Open Opportunities by stage · Customer acquisition cost (CAC) (last 30 days),

Opportunity Pipeline Project management:- · Schedule & Time o Schedule performance index (SPI) o Deviation from planned working hour o Changes in Order · Resource utilization & labour Productivity o Employee training & worker satisfaction · Quality & Close Out o Document adequacy or completeness (Basic, Detail, Informative) o Safety & Inspection o Client satisfaction o Percentage of cancelled projects · Cost o Cost Variance (CV) o Cost of managing processes.

o Cost Performance Index (CPI). o Planned Value (PV)- Actual Cost (AC)- Earned Value (EV) o Return on Investment (ROI) · Milestone achievement o Percentage Missed milestones o Percentage of tasks completed o Percentage of projects completed on time Planner · Return on investment (ROI) · Productivity & efficiency: – o Schedule performance, o Employee satisfaction o Alignment with strategic business goals o Cost performance,,

  1. Cycle time.
  2. Engineering:- · Existing Product Support Cost · Number of Clients · Number of New Clients · Engineering effectiveness · R&D cost/benefit Ratio · Payback Period · Outsourcing rate · Engineering-on-time Delivery · Cost Performance Indicator (CPI) · Schedule Performance Indicator (SPI) Procurement & Sourcing · Number of Suppliers · Purchase order cycle Time · Supplier & supply availability · Supplier defect rate · Lead Time · Cost of purchase order · Procurement cost reduction · Procurement cost avoidance · Procurement ROI · Compliance rate (quality standard operational),

Right “quantity” to the right “place”. at the right “time”. for the right “Price” Quality Assurance & Quality Control · Efficiency indicator (productivity) o Right first time · Impact indicator o Customer satisfaction and fidelity. o Client retention rate (CRR) o Revenue per client/member (RPC) o Average class attendance for training (ACA) o Profit margin (PM) o Complaint rate o Overdue corrective actions · Effectiveness indicator (VALUE) o Internal audit plan adherence · Customer service indicator o Customer complaints · Safety indicator (quality),

  • Average daily attendance (ADA) Logistics & Storing · Shipping Time.
  • · Order Accuracy.
  • · Picking Accuracy.
  • · Delivery or shipment Time.
  • · Pick & Pack Cycle Time.
  • · Equipment Utilization Rate.
  • · Transportation Costs.
  • · Warehousing Costs.
  • · Pick & Pack Cost · Packing material utilization · Number of shipments · Inventory accuracy · Inventory turn over · Inventory to sales ratio · Compliance rate · Warranty Cost as percentage of sale Finance · Revenue per employee.

= Revenue/number of employees. · Profit per employee = Total profit/number of employees. · Utilization rate = (Total weekly billable hours logged/total weekly hours logged) x 100. · Average task completion rate · Overtime per employee, Employee capacity Commercial & Legal:- · Total cost of services (inside and outside) · Legal spend as percentage of revenue · Budget-to-actual total spend comparison (e.g., percent handled within budget) · Outside expense versus in-house · In-house lawyers versus revenue · Cost per matter · Cost per lawyer,

  • Spend after implementing e billing compared to spend without Site Supervisor:- · Cost vs.
  • Budget · Project progress relative to milestones,
  • · Number of complaints.
  • · Number of incidents/accidents.
  • · The number of working hours spent on different aspects of the works.
  • · The use of materials (Reconciliation).

· The number of defects, · The amount of waste generated and the amount of recycling, The number of variations, Social media manager:- · Social media conversion · Facebook Ads campaign performance · Social media followers, Social sentiment

What is the difference between EPC and contractor?

EPC is a contract comprising Engineering, Procurement and Construction. Turnkey is a contract comprising Engineering, Procurement and Construction. If you look at the definition, you may find no difference between two concepts, but there are some differences between two concept as follows; 1- In EPC, an employer will provide basic engineering to a contractor and the latter shall perform detailed design based of received basic design.2- In Turnkey, Employer will only provide certain technical specifications of the project and it is the responsibility of the contractor to prepare basic and detail design of the project.3- In turnkey, contractor is responsible to perform construction and commissioning, start-up and take over of the plant to employer, but in EPC, it may be the responsibility of other third person to do commissioning and start-up.

You might be interested:  How To Start A Cement Factory?

Is EPC same as SAP?

Guidance on how a home’s energy performance is calculated using the Standard Assessment Procedure (SAP) methodology, which underpins the Energy Performance Certificate (EPC).

What are the new rules on EPC?

What Is Epc Mode In Construction From 2025, all newly rented properties will be required to have an EPC rating of C or above. The recent Government change in rules would require that all new tenancies must have an EPC (energy performance certificate) rating of Band C or above, starting from 2025.

  1. For existing tenancies, the new regulations won’t apply until 2028.
  2. Currently properties require an EPC rating of ‘E’ or above.
  3. The new rule changes are in line with the Government’s net zero emissions by 2050 targets.
  4. Along with creating more energy efficient homes.
  5. What is an EPC rating? Measures the energy efficiency of a property on a scale of A-G.

The most efficient homes will be in band A and the least efficient homes in Band G. For a home to be sold or rented in the UK it is legally required to have an EPC. The certificate is then valid for 10 years. The impacts the new rules will have on Landlords Improving the minimum EPC rating from ‘E’ to ‘C’ will prove to be difficult for landlords, as it will require a lot of investment.

  • With the government estimating that it could cost approximately £4,700 on average to make such improvements.
  • The older the property the greater the cost, as older properties will require a lot more work and are less energy efficient compared to new properties.
  • Howells Head of Residential Conveyancing, Elizabeth Webster says “I already have investor clients considering selling some of their portfolio where they know it will prove extremely difficult to get the rating to C or above.” At current energy performance investment is capped at £3,500 for landlords, this will be raised to £10,000.

Once the new regulations are in place in 2025, landlords who don’t have a valid EPC could be fined £30,000. To speak to a member of the conveyancing team call 0114 249 66 66 or email [email protected] ‘No Fault Divorce’ is now an option for couples We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits.

Is EPC mandatory?

Energy Performance Certificates ( EPCs ) are needed whenever a property is:

built sold rented

You must order an EPC for potential buyers and tenants before you market your property to sell or rent. In Scotland, you must display the EPC somewhere in the property, for example in the meter cupboard or next to the boiler. An EPC contains:

information about a property’s energy use and typical energy costs recommendations about how to reduce energy use and save money

An EPC gives a property an energy efficiency rating from A (most efficient) to G (least efficient) and is valid for 10 years. Check how you could make your home more energy efficient using the Energy Savings Trust’s home energy check.

What happens if an EPC fails?

Can you fail an EPC? – Although you cannot technically ‘fail’ an EPC, if your home does not achieve a minimum rating of E, it cannot be let out to tenants. It can be sold, but buyers will not be able to get a buy-to-let mortgage on a property with a rating of F or G.

What is the difference between EPC and contractor?

EPC is a contract comprising Engineering, Procurement and Construction. Turnkey is a contract comprising Engineering, Procurement and Construction. If you look at the definition, you may find no difference between two concepts, but there are some differences between two concept as follows; 1- In EPC, an employer will provide basic engineering to a contractor and the latter shall perform detailed design based of received basic design.2- In Turnkey, Employer will only provide certain technical specifications of the project and it is the responsibility of the contractor to prepare basic and detail design of the project.3- In turnkey, contractor is responsible to perform construction and commissioning, start-up and take over of the plant to employer, but in EPC, it may be the responsibility of other third person to do commissioning and start-up.

Is EPC the same as design and build?

EPC (Engineer-Procure-Construct) and Design-Build have both existed as mainstream delivery methods for decades, but what’s the difference between the two? If anything, they seem to share critical similarities. In both cases, the owner has a single point of contact on the construction side.

An EPC project typically results in a turnkey facility. At closeout, the EPC contractor hands over a working facility that’s ready to go. A design-build contract closes out similarly to design-bid-build contracts, with the owner and its construction manager or designer taking an active role in punching out the facility. EPC contractors are often handed little more than performance requirements (output levels, uptime levels, maintenance expense maximums, etc.), whereas most design-build contracts provide at least some design detail in the bridging documents. There is no EPC equivalent of the “design-assist” or “fast-track” design-build processes. Once again, this reflects the owner’s more minimal involvement in the EPC design process. Many contracts transfer far more risk to the contractor in an EPC delivery. Design-build contracts tend to take either a traditional design-bid-build approach to unknowns like hidden site conditions, or to share that risk between the owner and the design-builder. In contrast, it’s not uncommon for EPC contracts to shift these risks entirely to the EPC contractor.

Understanding the differences between these two seemingly quite similar design processes is a key step when assessing which delivery system is right for your project.